Đang tải... (xem toàn văn)
METHOD STATEMENT FOR SHOWER SCREEN WORK
Rivera Point Condominium Development -DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Riviera Point Project METHOD STATEMENT FOR SHOWER SCREEN WORK Relevant part reviewed by Checked by Prepared by Dept JY Lee QC/QA Safety Construction Engineering H Thu A Duc OJ Cho YC An Approved (by) Rev Date Description Ssangyong ICIC KLV Safety RPLLC A 29-Jul-2013 Issue for Acceptance SC Park M.Tan Bernarrd CM Leong B 28-Aug-2013 Issue for Acceptance SC Park M.Tan Bernarrd CM Leong Project:Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list Document Reference and Revision: Comment of MOS for Shower Screen Work_RevA Submission Description: Comment of MOS for Shower Screen Work_RevB Doc Rev A Comment No Reviewer’s Name and Company Comments Submission Date: 31 Jul 2013 28 Aug 2013 Contractor’s Reply (J.Y.Lee) Leong, RPLLC -Taniglass subcontractor is not approved yet, they should not be mentioned in the method statement Duc, RPLLC - No more comment Vuong, RPLLC -Method statement was written by Sub-Contractor, it must be full incharge by Ssy Vuong, RPLLC -Page 18/131: Where is show screen will be stored at the site Those are in the bath room Please see the item no 7.3 Vuong, RPLLC -Page 30&31/131: Provide size of gecko & screw Please see the section detail in annex There are two type of screws, longer one is 40mm (ø 4) to fix onto the wooden frame and shorter one is 10mm (ø 4) to fix onto the tile surface as its details In terms of the plastic gecko in general, shall be matched for each screw length and diameter Vuong, RPLLC How to control quality of mirror & glass? We will get randomly samples for testing or not? Tan, ICIC Page 23/131: It is better if using screws to fix SS U bar on wall and floor Fixing u-bar, will be fixed by silicon with grasping slot within flexible silicon grip because there has a waterproofing layer which have to avoid any damage Page 27/131: How to prevent wall tile from breaking when installing the hinges? How to connect glass door to hinge? Cutting by grinder to make the glass sheet inserting slot It shall be used by the grasp device which has fastening bolt with rubber sheet in it Tan, ICIC Project: Riviera Point Project Document No: RP_MOS -SSW _SSY_ 01 Date: 13 Aug 2012 Produced by: Leong It has eliminated Noted Some parts of it are reflected as their requirement that it went through a discussion with each count department in SSY The test was conducted for tempered glass sheet on middle of march in this year as attached certification So we would think of that can be proved the quality of it Tan, ICIC Page 30/131: How to prevent wall tile from breaking when installing the aluminium u-bar? 10 Tan, ICIC Page 32/131: Based on approved shop drawing, the interval distance of silicone dot is 150mm not 350mm 11 Tan, ICIC Page 33/131: Will silicone be applied around mirror to cover the gap between mirror and aluminium V bar? 12 Bernarrd, RPLLC No more comment For u-bar installing, there will be made a bit widen inserting slot in advance Then fixing by silicon, will be used to avoid any harm to the waterproofing layer and tile also 150mm distance is accurate It has corrected as the drawing The silicon for bonding agent shall not be covered on the mirror and v-bar frame because it will be possibly occurred some mold on it Reviewer’s suggested status code for this revision only: ICIC Consultant TYLIN Structural Review Consultant JRP MEP Review Consultant KPK Cost Consultant Other (state) Other (state) Other (state) RPLLC This section is to record the reviewing party’s suggested status code only: the official status code for the submitted item is recorded on the first sheet of this document Project: Riviera Point Project Document No: RP_MOS -SSW _SSY_ 01 Date: 13 Aug 2012 Produced by: Leong Riviera Point Condominium Development DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY CONTENTS Introduction Definition and Abbreviation General Procedure Resources (Materials, Equipments&Human Resources) Principle of Work Procedure Working Plan Method Statement QA / QC Plan Safety Management Plan 10 Risk and Control 11 Special Tool 12 Access and Egress 13 Emergency Preparedness 14 PPE Project:Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list Riviera Point Condominium Development DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Introduction This method statement relates to the installation work for Shower screen installation The project site is located in District 7, HCMC of Vietnam We recognize that safety, health and environment (SHE) are primary premise in all decisions, being made for successful construction and shall comply with the relavant local authorities of Ho Chi Minh City, Socialist Republic of Vietnam We will develop the construction method with the focus to avoid any harm to the health and safety of owner’s personnel, contractor employees and the public and also to minimize adverse effect to the natural and around environment All necessary specifications, inspection and quality control will be complied with the contract documents, specification If there is any discrepancy in the descriptions below, it will be designated by RPLLC Summary of work Content Work Product Remark Work Zone Tower Glass bathroom m2 Quantity Work Zone Quantity Block Block Block Ground Floor Shop House Total 860.94 665.24 729.65 2255.83 Tower Mirror Block Block Block Ground Floor Shop House Total m2 590.08 513.71 471.32 1575.11 Project:Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 5/150 27.08.2013 Riviera Point Condominium Development DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Definition & Abbreviation The abbreviations are used for this method statement, as shown below: ① Project Definition Project: Riviera Point Project (Phase 1A) Main-Contractor: Ssangyong Engineering & Construction Co.Ltd Sub-Contractor: Subcontractor JSC ② Project Abbreviation SSY: Ssangyong engineering & Construction Co.Ltd RPLLC: Riviera Point Limited Liability Company KPL: Keppel Land Construction PM: Project Manager, CM: Construction Manager, SM: Site Manager PD: Project Director, PJC: Project company, KPLS: Keppel Land Safety team SCM: Senior Construction Manager, SEM: Senior Engineering Manager, SHE: Safety Health Environment, RFT: Raft, SAC: Safety Awareness Center, QA: Quality Assurance, QC: Quality Control, QS: Quality Surveyor DWG: Drawing, BSMT: Basement, FDN: Foundation, BLK: Block, Q’ty: Quantity, MS: Method Statement, M/C: Main Contractor, S/C: Sub Contractor, Project:Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 6/150 27.08.2013 Riviera Point Condominium Development DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY General Procedure The main scope of work is for Shower screen installation Tempered Safety Glass: Produced by Super T production line, considered as the most modern line in Vietnam MANUFACTURING PROCESS Dimension measured at site Raw glass sheet Cutting & Edging Cleaning Heating to 650C - 750C Cooling down Testing & Finishing Product Installed at the site Project Manager will be responsible to manage and supervise the installation at site, to ensure the workmanship, site safety, and installation progress Raw Material Purchasing Glass Hardware Installation Inspection Process in Factory Transport to site Screw & gasket Cleaning Hand over Project:Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 7/150 27.08.2013 Riviera Point Condominium Development DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Resources (Materials, Equipments & Human Resources) 4.1 List of materials No Material Name Description Fixing Screw M5x30 pcs Fixing Lug Thk 1.2, Galvnised steel pcs Anchor Plastic plastic pcs Silicone Weather Sealant pcs Q’ty Unit Notes 4.2 List of tools No Material Name Description Drilling Machine General Pcs Electric Cable General M Level Cross line laser EA Level Magnetic EA Silicon Gun General EA Plastic Hammer General EA Suction Cap General EA Q’ty Unit Notes Project:Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 8/150 27.08.2013 Riviera Point Condominium Development DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY 4.3 Human Resources – Deployment of Manpower (SsangYong) No Name Position Mr Cho O.J Ssy SCM Mr Duc Ssy SHE Manager Mr H.O.Thu Ssy QA/QC Manager 4.4 Human Resources – Deployment of Manpower (Subcontractor) No Name Position Mr Lê Trọng Lập Operating Director Mr Trần Văn Thoại ( 0909.816.933 ) Project Director Mr Thọ Deputy Project Manager Mr Ngân Site Manager Mr Vinh, Mr Phúc QA/QC Manager, Safety Manager Mr Tuấn Defuty Factory Manager Project:Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 9/150 27.08.2013 Riviera Point Condominium Development DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Project:Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 10/150 27.08.2013 VFG Vietnam Float Glass Company Purpose:Reference TRANSLATION OF TCVN 7218 2002 Page of : the draft of Vietnam Glass and Ceramic for Construction Corporation The standard has been worked out following the suggestion by the Ministry of Construction, approved by Directorate for Standards Measurement and Quality- STAMEQ and approved by the Ministry of Science and Technology Quality acceptance regulation: 6.1 Quality acceptance regulation shall be applied to each lot of clear float glass product A lot consists of number of sheets of clear float glass with same type, same size and considered as having been manufactured under the same conditions 6.2 Samples shall be taken randomly from each lot in accordance with the provision in the Table 6.3 A product lot is considered as accepted when the number of non-conforming sheets, after undergoing the test defined in Method of test, not exceed the permissible number of rejection stipulated in the Table Table – Quality acceptance regulation Lot size (sheet) Number of randomly taken samples (sheet) Permissible number of rejection (sheet) From to 50 From 51 to 150 From 151 to 500 From 501 to 3200 From 3201 to 35000 More than 35000 8 13 20 32 1 Conventional expression: Following is the written conventional expression of the clear float glass being produced in compliance with this standard: Glass product name, thickness, length and width and conventional name of this standard For example: Clear float glass, transparent, used in construction, thickness of mm, length of 6.00 m, width of 3.21 m shall be conventionally expressed as the following: Clear float glass, mm, 6000 mm x 3210 mm TCVN 7218 : 2002 (K Ý n h næi không mầu) SsangYong E&C 136/150 27.08.2013 VFG Vietnam Float Glass Company Purpose:Reference TRANSLATION OF TCVN 7218 2002 Page of : Packaging, Labeling, Conservation, Transportation: 8.1 Packaging: Clear float glass with the same size and same type shall be packaged in specialized equipment with suitable shock-absorbing materials that secure protection of glass from damage On each package of clear float glass, the symbol of warning fragile property must be signed 8.2 Labeling: The label on each package of clear float glass must provide the followings: - Manufacturer’s name - Conventional expression as stipulated in - Number of sheets or number of square meter per each package - Production date 8.3 Stocking, Conservation: Packages of clear float glass shall be conserved in warehouse and in dry condition The same packages shall be neatly arranged on rack and incline of from 10 to 15 degree from vertical direction 8.4 Transportation: During transportation, packages of clear float glass must be put in specialized racks to avoid being damages SsangYong E&C 137/150 27.08.2013 VFG Vietnam Float Glass Company Purpose:Reference TRANSLATION OF TCVN 7218 2002 Page of : SsangYong E&C 138/150 27.08.2013 DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT (RIVIERA POINT) AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY ANNEX Certification Project : Riviera Point Condominum Development Produced by : Ssangyong E&C Preparing Duration : days Revision No: A SsangYong E&C 139/150 27.08.2013 SsangYong E&C 140/150 27.08.2013 SsangYong E&C 141/150 27.08.2013 SsangYong E&C 142/150 27.08.2013 SsangYong E&C 143/150 27.08.2013 SsangYong E&C 144/150 27.08.2013 SsangYong E&C 145/150 27.08.2013 SsangYong E&C 146/150 27.08.2013 SsangYong E&C 147/150 27.08.2013 SsangYong E&C 148/150 27.08.2013 SsangYong E&C 149/150 27.08.2013 SsangYong E&C 150/150 27.08.2013 ...Document Reference and Revision: Comment of MOS for Shower Screen Work_ RevA Submission Description: Comment of MOS for Shower Screen Work_ RevB Doc Rev A Comment No Reviewer’s Name and Company... Check before starting work by supervisor Safety supervision on workers during working Safety assembly at the end of working day 9.6 Site clean up and wrap up at the end of work Site safety work. .. (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY General Procedure The main scope of work is for Shower screen installation