Biện pháp cán láng nền nhà

82 37.7K 2
Biện pháp cán láng nền nhà

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

Biện pháp cán nền dự án Riviera Point - Nhà thầu thi công Ssang Yong Hàn Quốc

Rivera Point Condominium Development -DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Riviera Point Project METHOD STATEMENT FOR SCREEDING WORK Relevant part reviewedby Checked by Prepared by QC/QA Safety Construction Engineering JY Lee H Thu A Duc OJ Cho YC An Date Description Dept Approved (by) Rev Ssangyong ICIC KLV Safety RPLLC A 11-Jul-2013 Issue for Acceptance SC Park M.Tan Bernarrd CM Leong B 01-Oct-2013 Issue for Acceptance SC Park M.Tan Bernarrd CM Leong Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list Document Reference and Revision: Comment of MS for Screeding Work_RevA Submission Description: Comment of MS for Screeding Work_RevB Doc Rev Comment No Reviewer’s Name and Company Comments Submission Date: 15 Jul 2013 26 Sep 2013 Contractor’s Reply (and name) Duc, RPLLC No more comment Vuong, RPLLC No more comment Bernarrd/Khoe, RPLLC Page 21& 22: Safety plan is not written correctly, please correct it and compile the content in the RA & JSA The contents are reflected on RA and it is deleted Bernarrd/Khoe, RPLLC Page 57~59, please provide RA conducted with team member name & provide fully information & comply with RA process chart The RA process is complied as the process chart and the person in charge has been indicated each team leader because the position of the personnel is quite changeable yet Bernarrd/Khoe, RPLLC Please update JSA according to the RA updated specifically (page 60&61) It has been updated Bernarrd/Khoe, RPLLC PPE for this scope of work is not consistency between Resources (page 6) & safety plan (page 21&22), please provide specific PPE relevant with work sequence It has been specified as you pointed out A Tan,ICIC Tan,ICIC Project: Riviera Point Project Document No: RP_MOS -SW _SSY_ 01 Date: 31 Jul 2013 Produced by: Leong Page 11/88:  Please quote where our specification allows compressive strength of mortar is minimum 7.5 N/mm2 as strength of mixture 1:4 (cement : sand) is higher than?  This page indicated mixing ratio of cement and sand was 1:4, but page 17/88 was 1:3 so which one is correct? Page 14/88: please see comment on attached below  The compressive strength of mortar is minimum 7.5 N/mm2 as strength of mixture 1:4 (cement : sand) follow the contract specification  Mixing ratio of cement and sand was 1:4 is correct It has been deleted Tan,ICIC Page 16/88: please see comment on attached below It has been deleted item 10 Tan,ICIC Page 17/88: please clarify why you use dry mortar for screeding work? Dry mortar shall not use for screeding work Tan,ICIC Page 20/88: tolerance of screeding level 10mm may not be accepted as it will cause a different level of tiling work and other trade Tolerance of screeding level for tiling work shall be:  +/- 5mm under a 3m straight edge  +/- 3mm under a 2m straight edge  +/- 2mm under a 1m straight edge The cement slurry shall be mixed additive with Sika latex to increase the cohesion of cement mortar It shall be conducted once a floor for all wet trade 11 12 Tan,ICIC Please specify which bonding agent will be applied to link concrete surface and screeding mortar? 13 Tan,ICIC Please indicate how frequency of strength test for screeding mortar is? Reviewer’s suggested status code for this revision only: ICIC Consultant TYLIN Structural Review Consultant JRP MEP Review Consultant KPK Cost Consultant Other (state) Other (state) Other (state) RPLLC This section is to record the reviewing party’s suggested status code only: the official status code for the submitted item is recorded on the first sheet of this document Project: Riviera Point Project Document No: RP_MOS -SW _SSY_ 01 Date: 31 Jul 2013 Produced by: Leong Rivera Point Condominium Development -DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY CONTENTS Introduction Definition and Abbreviation Scope of Work Resources (Materials, Equipments & Human Resources) Sequence of Work Plant & Machinery Communication : Call-up List Power Lighting 10 Access and Egress 11 Emergency Preparedness 12 Risk and Control APPENDICES 1~6 (please refer to the next page) Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list Rivera Point Condominium Development -DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY APPENDICES Appendix ……….… Risk Assessment & Job Safety Analysis Appendix ………… …………………………Organization Chart Appendix ………………………………………………… Drawings Appendix …………… …………… Material safety data sheet Appendix …….…… ……………………………… First Aid Plan Appendix …….…………………………… Material Specification Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list Rivera Point Condominium Development -DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Introduction This method statement relates to the Screeding work The project site is located in District 7, HCMC of Vietnam We recognize that safety, health and environment (SHE) are primary premise in all decisions, being made for successful construction and shall comply with the relavant local authorities of Ho Chi Minh City, Socialist Republic of Vietnam We will develop the construction method with the focus to avoid any harm to the health and safety of owner’s personnel, contractor employees and the public and also to minimize adverse effect to the natural and around environment All necessary specifications, inspection and quality control will be complied with the contract documents, specification If there is any discrepancy in the descriptions below, it will be designated by RPLLC Definition & Abbreviation The abbreviations are used for this method statement, as shown below : 1) Project Definition - Project: Condominium housing development Riviera point (Phase 1A) - Main-Contractor: Ssangyong Engineering & Construction Co.Ltd 2) Project Abbreviation - SSY: Ssangyong engineering & Construction Co.Ltd - RPLLC: Riviera Point Limited Liability Company, KPLC: Keppel Land Construction - PM: Project Manager, CM: Construction Manager, SM: Site Manager - PD: Project Director, PJC: Project company, KPLS: Keppel Land Safety team - SCM: Senior Construction Manager, SEM: Senior Engineering Manager - SHE: Safety Health Environment, RFT: Raft, SAC: Safety Awareness Center - QA: Quality Assurance, QC: Quality Control, QS: Quality Surveyor - DWG: Drawing, BSMT: Basement, FDN: Foundation, BLK: Block, - NT : Ngũ Thường Ltd Co., Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 6/82 30.09.2013 Rivera Point Condominium Development -DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Scope of work The main scope of work is Screeding work [ Site Location of Riviera Point Project ] Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 7/82 30.09.2013 Rivera Point Condominium Development -DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Resources (Materials, Equipments & Human Resources) 4.1 Resources for plastering work No Material Name Type Unit Cement PCB40 bag Sand Common m3 Admixture Sika latex littre Water Clean Notes Not for concrete Plenty 4.2 Resources for Equiment No Equipment name Production Unit Quantity Hacking machine 2010 set Hand cutting machine 2010 set 10 Mixing machine 250 - 500lit 2010 set Level laser machine GPI 2009 set Measuring tape 2010 set Glove Rubber coated glove EA 30 Mask Dust filteringTextile mask EA 30 Shoes Safety shoes EA 30 Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 8/82 30.09.2013 Rivera Point Condominium Development -DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY 4.3 Plan of Vertical supplying material by Hoist Hoist will be reach levels below from the level that is in progress of RC Work Hoist Material Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 9/82 30.09.2013 Rivera Point Condominium Development -DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY 4.4 Equipment Location & Lifting Loading Chart 4.5 Losistics Plan for Item Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list SsangYong E&C 10/82 30.09.2013 SsangYong E&C 68/82 30.09.2013 SsangYong E&C 69/82 30.09.2013 SsangYong E&C 70/82 30.09.2013 DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT (RIVIERA POINT) AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY ANNEX First Aid Plan Project : Riviera Point Condominum Development Produced by : Ssangyong E&C Preparing Duration : days Revision No: A SsangYong E&C 71/82 30.09.2013 LETTER OF APPOINTMENT Appointment as First Aider /Industrial Nurse Project: friAr -'\ ~t NGf- 1tt:tJ (name), ID No t}(Y)z_Q] ~~ 2-\NRICI EP/WP) and I, contact number rn~ ltf:bCro;:or of SS~~t understand that as a First Aider I Industrial Nurse of th (company) above ent1oned ProJect, 1t IS my dut1es and responsibilities to ensure that the provisions under the Regulations and Statutory requirement are complied with My duties and responsibilities as First Aider I Industrial Nures are as follows : 1) Possess a valid industrial first aid certificate and be promptly identified on site and attend refresher course before expiry of the valid certificate 2) Render treatment of minor injuries which not need treatment by a medical practitioner 3) Render first aid treatment for the purpose of preserving life and minimizing the consequences injury until help arrives 4) To liaise with the arrival of the paramedics and report the status of the injured 5) Assist to clearly identify every first aid box or container and ensure that they are accessible 6) Check on a monthly basis , all first aid boxes or containers assigned to me, to ensure that it is fully equipped and all items are usable Replenish if necessary 7) Ensure that first aid treatment room is kept clean and tidy and not being misuse 8) Maintain a log book of treatment rendered and report to the HSE Manager 9) Participate in all emergency drills and exercises 0) Assist in incident I accident investigations by providing accurate account of treatment rendered to the injured Accepted By : Endorsed By SSYENC Project Name ~:::··· Designation Designation Designation Signature Signature Signature Date Date Date Appointed by Contractor Project I Site Manager: Name : , JA-t IAN ' tfM-ll.- ~ c -l~·-9v -. ­ NB :A copy of relevant certificate is attached SHE-LOA-First Aider 2011 SsangYong E&C 72/82 Revision 0, Oct 30.09.2013 Pa e of l Contractor 2,~Af\t'$-Yf'N'~ Date Of Inspection Location f~k_ Type Of 1st Aid Bo)( AIBIC v Narne Of First Aider f~tMT~Tt~ Signature II' "I I tVJ )

Ngày đăng: 06/01/2020, 17:44

Tài liệu cùng người dùng

Tài liệu liên quan