METHOD STATEMENT FOR PAINTING WORK
Riviera Point Condominium Development DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Riviera Point Project METHOD STATEMENT FOR PAINTING WORK Relevant part reviewed by Checked by Prepared by Dept JY Lee QC/QA Safety Construction Engineering H Thu A Duc OJ Cho YC An Approved (by) Rev Date Description Ssangyong ICIC KLV Safety RPLLC A 3-Jun-2013 Issue for Acceptance SC Park M.Tan Bernarrd CM Leong B 11-Jul-2013 Issue for Acceptance SC Park M.Tan Bernarrd CM Leong C 20-Aug-2013 Issue for Acceptance SC Park M.Tan Bernarrd CM Leong Project : Riviera Point Condominium Development Produced by : Ssangyong E&C Assessment Duration : 7days Document No : Refer to the submital list Document Reference and Revision: Comment of MOS for painting work_RevB Submission Description: Comment of MOS for painting work_RevC Doc Rev Comment No Reviewer’s Name and Company Comments Duc, RPLLC Based on pages 4/96 & 49/96, please clarify material use exterior putty, it is Jotun or Seamaster? Duc, RPLLC Page 5/96, mixing and stirring process shall be ready inside floor area Duc, RPLLC How to check and control the density for layers (skim coating, sealer & coating) What is specify in our contract? Duc, RPLLC Page 12/96, item 30 “to ensure surface obtain good covering, uniform color and smooth” please specify cover method? Duc, RPLLC Page 14/96 please separate method statement for gondola installation work Duc, RPLLC To provide: -Protection method to material during rainy days not specify -Tool to check humidity -How large of area that will be applied for each inspection storey floor? -Internal inspection form? -Gondola installation work & equipment used, please to submit separately? -By gondola using: please to draw out what are work sequence : transfer material, mixing proportion and application… where are access for workers to external RC wall How large for each applicable batch -How is groove line work to RC wall? A Project: Riviera Point Project Document No: RP_MOS _P _SSY_ 02 Date: 31 Jul 2013 Produced by: Leong Submission Date: 04 June 2013 12 July 2013 20 Aug 2013 Contractor’s Reply (and J.Y.Lee) Jotun exterior Putty is right In case, side wall on gondola is impossible to be supplied from each floor, that’s why the mixing bucket should carry on gondola from ground By visual checking and controlling the dilution while mixing to water & putty or paint In order to check for density, paint layers will be checked by the tool of wet film thickness By visual checking and controlling the dilution while mixing to water & putty or paint It will be submitted on September Now the painting Method is focused on Mock up room - Protection for painted surface has no solution when it rained, however, before applying paint, the rain possibility will be presumed that checking humidity by phychro-meter, also refer to the national weather forecast, based on that we will get decision to proceed - Checking tool of the surface humidity shall be used by moisture-meter - Inspection is normally conducted 3-5 point per wall - Inspection form is inserted at the end of annex - Method statement of gondola installation work shall be submitted on September - Gondola usage needs to show for the gable wall painting situation that shall be proceeded from top to bottom And materials shall be loaded from bottom then also , mixing proportion shall be carried out on gondola because it can be loaded till 700kg and has Vuong, RPLLC Page contents: what is meaning “please! Refer to the MS for tower crane (General)”, please electric outlet The maximum size of gondola is 0.8mx7.5m Those information can be referred to the presentation data for working platform of architectural works Workers shall be taken on the ground floor Each painting session of area is normally 3-5 points checking for a wall - Groove line’s substrate will be treated on architectural cage after that putty and painting work is on gondola -It is corrected -Please refer to presentation data for working platform of architectural cage, there has description of gondola usage Vuong, RPLLC Page 6/96, please check external mock up painting have ceiling or not The external ceiling is the balcony ceiling Vuong, RPLLC Page 17/96, where is method statement of Jotun Exterior Putty It has been described on annex 1.1 and 1.2 10 Vuong, RPLLC Please re-check item 5.2.3, Ssy will use external putty for internal wall & ceiling, it is correct or not? Paint for internal surface: Using Jotun Interior putty It is corrected 11 Vuong, RPLLC Please re-check item 5.2.3, Ssy will use Jotasealer Primer for internal wall & ceiling, it is correct or not? Because the product is used for external It is corrected by proper product name, both name are slightly different between Jotasealer 03 for external and Jotasealer primer for internal 12 Vuong, RPLLC Page 34/96, please revise stage, it is layer not comment for page 39/96 13 Bernarrd/ Minh, RPLLC Please provide the completed content as stipulated in MS guideline page It is corrected 14 Bernarrd/ Minh, RPLLC Please provide RA, JSA to the relevant work scope accordingly It is inserted 15 Bernarrd/ Minh, RPLLC Please provide the current organization chart It shall be submitted separately by official submission because the subcontractor would be changed 16 Bernarrd/ Minh, RPLLC Please provide the PPE listing as to the proposed work scope It is inserted rd Project: Riviera Point Project Document No: RP_MOS _P _SSY_ 02 Date: 31 Jul 2013 Produced by: Leong st nd layer Same It is corrected 17 Bernarrd/ Minh, RPLLC Please provide material safety data sheet (MSDS) in relationship to all material to be used as proposed in this method It is inserted at annex 18 Bernarrd/ Minh, RPLLC Do not allow to carry out mixing skim coat on scaffold (page 33/96) It is corrected 19 20 Tan, ICIC Tan, ICIC Jotasealer Primer is internal Primer, why did you apply it for exterior painting work (item 21 – page 9/96) Based on technical data of Jotun Exterior Putty mixing ratio of putty and water is 3:1 by weight It means that bag/40kg of putty will be mixed with 13 litres of water, why did your MOS indicate 16 litres of water? Based on technical data of Jotun Exterior Putty and Jotun Internal Putty, the drying time of them is different one recoated after hours and another is 24 hours So please separate 21 Tan, ICIC 22 Tan, ICIC Based on technical data of Jotasealer, mixing sealer with the thinner maximum 5%, please comply 23 Tan, ICIC Item 27 - page 11/96: technical data did not indicate it, please explain and get advice of manufacturer 24 Tan, ICIC Item 5,6 - page 23/96 Item - page 24/96 Item 19 - page 27/96: Why did you apply Jotun Exterior Putty for internal painting? 25 Tan, ICIC 26 Tan, ICIC Project: Riviera Point Project Document No: RP_MOS _P _SSY_ 02 Date: 31 Jul 2013 Produced by: Leong This MOS only mentioned to Jotun Putty whether there is any difference (ex: consumtion, application sequence, mixing…) if you use Seamaster Putty? This MOS did not indicate details of Gondola, so you are required to submit separately for Gondola It is mis-naming for Jotasealer primer of external wall, So, proper brand name is Jotashield primer those are slightly different of spelling And internal primer’s name is Jotasealer 03, Those brand names are also very similar but different from internal thing Confirmed dilution ratio: 40Kg Putty/ 13 litres of water for normal case We need extra water, in case the plain surface is too dry so that it can get adequate adhesion The standard drying duration is indicated on technical data sheet However, its time depends on the condition on humidity & windy The other words, inside areas there are times to get higher humility and less ventilation than outside one, in this case, the drying time should be adjusted by crafts mas’ perception on each job’s detail It will be complied as technical data sheet Supplier confirmed that when the paint comes to dry in the bucket over hour, water should be added in it in order to keep the proper viscosity It’s typo, it’s corrected It’s the only putty material in this work and consumption, application, sequence, and mixing information is indicated on the statement and annexes, especially on technical data It will be submitted on September 27 Tan, ICIC There will be some location where you can not use Architecture working cage and Gondola for painting work So could you tell us you intend to use Spider man for painting work if any you have to get approval from RP client The remained external area can be accessed all around because the gondola can adjust to approach with extension by 1.7m It shall be able to controlled how finished topcoat is by ; o Apply fully paint system as proposed and got approved o Carefully check the surfaces right after applying the primer coat, polish or make even (if need) o While applying each layer of top coats, It shall be strictly exam the worker’s diluting the paint and water (with ratio as proposed in Technical Data sheet) to avoid the result of finished layer too thin It could incur some damage very soon So we will try to reduce it also o After completion of applying, check about colour and aesthetic for the finalization 28 Duc, RPLLC Reply item 4: not cleared 29 Vuong, RPLLC No more comment 30 Bernarrd, RPLLC No more comment 31 Tan, ICIC Reply item 23: Please provide official confirmation of supplier It is attached on annex of certification 32 Tan, ICIC Reply item 25: what have difference between Jotun putty and Seamaster putty? As this MOS did not mention to Seamaster putty? Both are same performance to make proper substrate It isn’t indicated the name anymore as reply no B Reviewer’s suggested status code for this revision only: ICIC Consultant TYLIN Structural Review Consultant JRP MEP Review Consultant KPK Cost Consultant Other (state) Other (state) Other (state) RPLLC This section is to record the reviewing party’s suggested status code only: the official status code for the submitted item is recorded on the first sheet of this document Project: Riviera Point Project Document No: RP_MOS _P _SSY_ 02 Date: 31 Jul 2013 Produced by: Leong Rivera Point Condominium Development DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY CONTENTS * ANNEXS ……………………………………………………… RA & JSA ……………………………………………………… Organization Chart ……………………………………………………… Drawings ……………………………………………………… Specifications ……………………………………………………… Certification ……………………………………………………… MSDS ……………………………………………………… Special Toolsl Project:Rivera Point Condominium Development Produced by:Ssangyong E&C Preparing Duration :7days Revision: A Rivera Point Condominium Development DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY SCOPE This method statement is for the Painting work The working Platform and Gondola will be installed step by step, safely fulfilling as the installation plan by special team based on each method statement GENERAL PRECAUTIONS To avoid dangerous and expensive consequences, the following points should be observed : All operations should be carried out by special team, under the immediate supervision of an SSang-yong safety dept For the applying process, a roped -off area is required The area should be large enough to permit the components to be stacked and handled, and the applying to be without Interfering site activities and risking the other site personnel Sufficient area must be set aside for the high position work EQUIPMENTS AND TOOLS / TACKLES Gondola & Scaffolding : For treatment of substrate at the external wall surface For applying of paniting materials such as Skim coat, Putty, Primer, Paint at the external wall Hand tool : All tools and tackles supplied by special team under supervision of Ssangyong safety dept Project:Rivera Point Condominium Development Produced by:Ssangyong E&C Preparing Duration :7days Revision:C SsangYong E&C 7/152 19.08.2013 Rivera Point Condominium Development DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY List of equipment : No Material Name Type Unit Notes Accessories (Brush, roller, hammer, chisel, wire brush) many EA many Floor grinder portable EA Vacumn Cleaner portable EA Air Hose PVC M 100 Harness Full body type Set 30 Glove Anti Chemical rubber coated glove EA 30 Mask Dust filteringTextile mask EA 30 Shoes Anti chemicalankle shoes EA 30 Safety helmet C, G, E EA 30 RESOURCES (Materials, Equipments & Human Resources) 4.1 List of material No Material Name Type Unit Notes Water Clean liter plenty Jotun Ext Putty Pre coat m2/kg 0.8 Jotashield Primer 1st coat m2/kg 9.1 Jotashield 2nd coat m2/kg 5.5 Jotun Int Putty Pre coat m2/kg 0.8 Jotasealer 03 1st coat m2/kg 9.2 Jotaplast 2nd coat m2/kg 5.0 Project:Rivera Point Condominium Development Produced by:Ssangyong E&C Preparing Duration :7days Revision:C SsangYong E&C 8/152 19.08.2013 Rivera Point Condominium Development -DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY Organization It is indicated at the annex APPLYING PROCEDURE 5.1 Flow Chart Procedure of Installing bracing Material Preparation Inspection by Ssy QC mngr YES Working Platform Installation NO YES Surface preparation Inspection by S.A.C Fine Tune 1st Skim coat or Putty 2nd Skim coat or Putty Surface sending Inspection by SSY QC YES Repeating Primer Drying 1st finish coat 2nd finsh coat NO YES NO FINE-TUNE Inspection by ICIC / KPL YES Final Touch up NO FINE-TUNE YES Painting complete Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Preparing Duration : 7days Revision : S SsangYong E&C 9/152 19.08.2013 Rivera Point Condominium Development -DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY 5.2 Description of working sequence 5.2.1 External Mock up painting 1) Surface must be dried To ensure moisture substance not exceeding 20% Checking with Moisture Meter 2) To remove foreign and unstable matters such as dirt powder, cement splashes and other contaminants Manual cleaning by chipping, scrapping or wire brushing 3) Surface must be free from oil and grease Wiping with cloth dampened solvent Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Preparing Duration : 7days Revision : S SsangYong E&C 10/152 19.08.2013 Jotasealer 03 14 Transport information International transport regulations Proper shipping name : - UN Number : Not regulated Class : - Sub-risk : - Packing group : - Label : Additional information ADR / RID IMDG : : Marine pollutant: No : IATA This preparation is not classified as dangerous according to international transport regulations (ADR/RID, IMDG or ICAO/IATA) Transport in accordance with ADR/RID, IMDG/IMO and ICAO/IATA and national regulation - 15 Regulatory information The product is labelled as follows, in accordance with local regulations: EU regulations : The product is classified and labelled for supply in accordance with the Directive 1999/45/EC as follows: Hazard symbol or symbols : Irritant : mixture of: 5-chloro-2-methyl-4-isothiazolin-3-one [ec no 247-500-7] and 2-methyl-2h-isothiazol-3one [ec no 220-239-6] (3:1) : R43- May cause sensitisation by skin contact : S2- Keep out of the reach of children S23- Do not breathe [***] S24- Avoid contact with skin S37- Wear suitable gloves S46- If swallowed, seek medical advice immediately and show this container or label S51- Use only in well-ventilated areas Contains Risk phrases Safety phrases 16 Other information CEPE Classification Full text of R-phrases referred to in sections and - Europe Notice to reader History Date of printing Date of issue Version Prepared by : : R23/24/25- Toxic by inhalation, in contact with skin and if swallowed R34- Causes burns R43- May cause sensitisation by skin contact R50/53- Very toxic to aquatic organisms, may cause long-term adverse effects in the aquatic environment : : : : 11.07.2007 11.07.2007 Jotun Group Product Safety Department The information in this SDS is based on the present state of our knowledge and on current laws The product is not to be used for purposes other than those specified under section without first obtaining written handling instructions It is always the responsibility of the user to take all necessary steps to fulfil the demands set out in the local rules and legislation The information in this SDS is meant to be a description of the safety requirements for our product It is not to be considered a guarantee of the product's properties Indicates information that has changed from previously issued version Date of issue SsangYong E&C : 11.07.2007 138/152 19.08.2013 Page: 4/5 Conforms to Regulation (EC) No 1907/2006 (REACH), Annex II SAFETY DATA SHEET Jotaplast Identification of the preparation and of the company Product name and/or code Label No Supplier/Manufacturer : Jotaplast : 3754 : Jotun (Singapore) Pte Ltd 11 & 15 Sixth Lok Yang Road Singapore 628111 Phone: 6508 8288 Fax: 6265 7484 SDSJotun@jotun.com Emergency telephone number : Jotun (Singapore) Pte Ltd, Tel: 6508 8288 Hazards identification The product is classified as dangerous according to Directive 1999/45/EC and its amendments May cause sensitisation by skin contact Harmful to aquatic organisms, may cause long-term adverse effects in the aquatic environment Irritant Composition/information on ingredients Substances presenting a health or environmental hazard within the meaning of the Dangerous Substances Directive 67/548/EEC Classification Product/ingredient name isoproturon (ISO) Identifiers EC: 251-835-4 CAS: 34123-59-6 % 67/548/EEC Regulation (EC) No 1272/2008 [CLP] Type Notes [1] - T; R23/24/25 C; R34 R43 N; R50/53 Carc 2, H351 Aquatic Acute 1, H400 Aquatic Chronic 1, H410 Acute Tox 3, H301 Acute Tox 3, H311 Acute Tox 3, H331 Skin Corr 1B, H314 Eye Dam 1, H318 Skin Sens 1, H317 Aquatic Acute 1, H400 Aquatic Chronic 1, H410 [1] - See Section 16 for the full text of the Rphrases declared above See Section 16 for the full text of the H statements declared above 0,025- Carc Cat 3; R40 0,1 N; R50/53 Index: 006-044-00-7 reaction mass of: 5CAS: 55965-84-9 chloro-2-methyl-4Index: 613-167-00-5 isothiazolin-3-one[EC no 247-500-7]and 2methyl-2H-isothiazol3-one [EC no 220239-6] (3:1) 0,00151- 0,06 Type [1] Substance classified with a health or environmental hazard [2] Substance with a workplace exposure limit [3] Substance meets the criteria for PBT according to Regulation (EC) No 1907/2006, Annex XIII [4] Substance meets the criteria for vPvB according to Regulation (EC) No 1907/2006, Annex XIII Occupational exposure limits, if available, are listed in Section SsangYong Date of issue E&C : 21.12.2011 139/152 19.08.2013Page: 1/5 Jotaplast First-aid measures First-aid measures General : In all cases of doubt, or when symptoms persist, seek medical attention Never give anything by mouth to an unconscious person If unconscious, place in recovery position and seek medical advice : Remove to fresh air Keep person warm and at rest If not breathing, if breathing is irregular or if respiratory arrest occurs, provide artificial respiration or oxygen by trained personnel : Remove contaminated clothing and shoes Wash skin thoroughly with soap and water or use recognised skin cleanser Do NOT use solvents or thinners : Check for and remove any contact lenses Immediately flush eyes with running water for at least 15 minutes, keeping eyelids open Seek immediate medical attention : If swallowed, seek medical advice immediately and show the container or label Keep person warm and at rest Do not induce vomiting Inhalation Skin contact Eye contact Ingestion Fire-fighting measures Extinguishing media Extinguishing media not to be used : Recommended: alcohol-resistant foam, CO2, powders, water spray : Do not use water jet Recommendations : Fire will produce dense black smoke Exposure to decomposition products may cause a health hazard Appropriate breathing apparatus may be required Cool closed containers exposed to fire with water Do not release runoff from fire to drains or watercourses Accidental release measures Personal precautions : Exclude sources of ignition and ventilate the area Avoid breathing vapour or mist Refer to protective measures listed in sections and : Contain and collect spillage with non-combustible, absorbent material e.g sand, earth, vermiculite or diatomaceous earth and place in container for disposal according to local regulations (see section 13) Preferably clean with a detergent Avoid using solvents Spill Note: see section for personal protective equipment and section 13 for waste disposal Handling and storage Handling : Avoid contact with skin and eyes Avoid inhalation of vapour, spray or mist Eating, drinking and smoking should be prohibited in areas where this material is handled, stored and processed Put on appropriate personal protective equipment (see Section 8) Never use pressure to empty Container is not a pressure vessel Always keep in containers made from the same material as the original one Comply with the health and safety at work laws When operators, whether spraying or not, have to work inside the spray booth, ventilation is unlikely to be sufficient to control particulates and solvent vapour in all cases In such circumstances they should wear a compressed air-fed respirator during the spraying process and until such time as the particulates and solvent vapour concentration has fallen below the exposure limits Storage SsangYong Date of issue : Store in accordance with local regulations Notes on joint storage Keep away from: oxidising agents, strong alkalis, strong acids Additional information on storage conditions Observe label precautions Store in a dry, cool and well-ventilated area Keep container tightly closed No smoking Prevent unauthorised access Containers that have been opened must be carefully resealed and kept upright to prevent leakage E&C : 21.12.2011 140/152 19.08.2013Page: 2/5 Jotaplast Exposure controls/personal protection Engineering measures : Provide adequate ventilation Where reasonably practicable, this should be achieved by the use of local exhaust ventilation and good general extraction Occupational exposure limits Personal protective equipment Respiratory system : If workers are exposed to concentrations above the exposure limit, they must use appropriate, certified respirators By spraying : particulate filter (FFP2 / N95) In confined spaces, use compressed-air or fresh-air respiratory equipment Hands : For right choice of glove materials, with focus on chemical resistance and time of penetration, seek advice by the supplier of chemical resistant gloves The user must check that the final choice of type of glove selected for handling this product is the most appropriate and takes into account the particular conditions of use, as included in the user's risk assessment Eyes : Use safety eyewear designed to protect against splash of liquids Physical and chemical properties Physical state Odour Colour Density Explosion limits Solubility : : : : : : Liquid Characteristic Various colours 1.46 g/cm3 0.6 - 4.2% Insoluble in the following materials: cold water and hot water 10 Stability and reactivity Stable under recommended storage and handling conditions (see section 7) Hazardous decomposition products: carbon monoxide, carbon dioxide, smoke, oxides of nitrogen Keep away from the following materials to prevent strong exothermic reactions: oxidising agents, strong alkalis, strong acids 11 Toxicological information There are no data available on the preparation itself The preparation is not classified as dangerous according to Directive 1999/45/EC and its amendments Repeated or prolonged contact with the preparation may cause removal of natural fat from the skin, resulting in nonallergic contact dermatitis and absorption through the skin If splashed in the eyes, the liquid may cause irritation and reversible damage Contains reaction mass of: 5-chloro-2-methyl-4-isothiazolin-3-one[EC no 247-500-7]and 2-methyl-2H-isothiazol-3-one [EC no 220-239-6] (3:1) May produce an allergic reaction 12 Ecological information There are no data available on the preparation itself Do not allow to enter drains or watercourses The preparation has been assessed following the conventional method of the Dangerous Preparations Directive 1999/45/EC and is classified for eco-toxicological properties accordingly See Sections and 15 for details Aquatic ecotoxicity Product/ingredient name isoproturon (ISO) Test Population reaction mass of: 5-chloro-2-methyl-4isothiazolin-3-one[EC no 247-500-7]and 2-methyl-2H-isothiazol-3-one [EC no 220239-6] (3:1) - SsangYong Date of issue E&C : 21.12.2011 Result Acute EC50 0,06 mg/L Fresh water Acute EC50 0,16 mg/l Acute EC50 0,027 mg/l 141/152 Species Exposure Aquatic days plants Duckweed Lemna minor Daphnia 48 hours Daphnia magna Algae - 72 hours 19.08.2013Page: 3/5 Jotaplast - Acute LC50 0,19 mg/l Selenastrum capricornutum Fish - Trout - 96 hours Oncorhynchus mykiss Photolysis - Biodegradability Not readily Not readily Ecological information Biodegradability Product/ingredient name Aquatic half-life isoproturon (ISO) reaction mass of: 5-chloro-2-methyl- 4-isothiazolin-3-one[EC no 247-5007]and 2-methyl-2H-isothiazol-3-one [EC no 220-239-6] (3:1) AOX : The product contains organically bound halogens and can contribute to the AOX value in waste water 13 Disposal considerations Do not allow to enter drains or watercourses Material and/or container must be disposed of as hazardous waste European waste catalogue : 08 01 11* Waste paint and varnish containing organic solvents or other dangerous substances If this product is mixed with other wastes, this code may no longer apply (EWC) If mixed with other wastes, the appropriate code should be assigned For further information, contact your local waste authority 14 Transport information Transport within user’s premises: always transport in closed containers that are upright and secure Ensure that persons transporting the product know what to in the event of an accident or spillage This preparation is not classified as dangerous according to international transport regulations (ADR/RID, IMDG or ICAO/IATA) 15 Regulatory information EU regulations Hazard symbol or symbols : The product is classified and labelled for supply in accordance with the Directive 1999/45/EC as follows: : Irritant Risk phrases : R43- May cause sensitisation by skin contact R52/53- Harmful to aquatic organisms, may cause long-term adverse effects in the aquatic environment : S2- Keep out of the reach of children S23- Do not breathe vapour / spray S24- Avoid contact with skin S37- Wear suitable gloves S46- If swallowed, seek medical advice immediately and show this container or label S51- Use only in well-ventilated areas Safety phrases Contains : reaction mass of: 5-chloro-2-methyl-4-isothiazolin-3-one[EC no 247-500-7]and 2methyl-2H-isothiazol-3-one [EC no 220-239-6] (3:1) : Not available Industrial use 16 Other information CEPE Classification Europe Full text of abbreviated H statements SsangYong Date of issue E&C : : H301 H311 H314 H317 H318 H331 H351 H400 Toxic if swallowed Toxic in contact with skin Causes severe skin burns and eye damage May cause an allergic skin reaction Causes serious eye damage Toxic if inhaled Suspected of causing cancer Very toxic to aquatic life : 21.12.2011 142/152 19.08.2013Page: 4/5 Jotaplast H410 H412 Full text of abbreviated R phrases Very toxic to aquatic life with long lasting effects Harmful to aquatic life with long lasting effects : R40- Limited evidence of a carcinogenic effect R23/24/25- Toxic by inhalation, in contact with skin and if swallowed R34- Causes burns R43- May cause sensitisation by skin contact R50/53- Very toxic to aquatic organisms, may cause long-term adverse effects in the aquatic environment R52/53- Harmful to aquatic organisms, may cause long-term adverse effects in the aquatic environment This Safety Data Sheet is prepared in accordance with Annex II to Regulation (EC) No 1907/2006 : 21.12.2011 Date of issue Version Notice to reader : The information in this SDS is based on the present state of our knowledge and on current laws The product is not to be used for purposes other than those specified under section without first obtaining written handling instructions It is always the responsibility of the user to take all necessary steps to fulfil the demands set out in the local rules and legislation The information in this SDS is meant to be a description of the safety requirements for our product It is not to be considered a guarantee of the product's properties SsangYong Date of issue E&C : 21.12.2011 143/152 19.08.2013Page: 5/5 MATERIAL SAFETY DATA SHEET PRELIMINARY MATERIAL SAFETY DATA SHEET PUTTY Date: 01/12/2005 Page of IDENTIFICATION OF THE PREPARATION AND COMPANY Product name : PUTTY Intended use : Decorative putty Name of company : Jotun Paints (Vietnam) Co., Ltd Address : No 1, Street 10, Song Than Industrial Zone, Di An District, Binh Duong Province Telephone no : (84-650) 742206 / 742207 / 742208 / 742209 For more information about product type and use: See Product Data Sheet COMPOSITION / INFORMATION ON INGREDIENTS Contains no substance presenting a health hazard within the meaning of the Dangerous Substances Directive 67/548/EEC Cement < 50% Calcium Oxide < 5% Viny/Ethylene Polymer < 5% Silica < 75% HAZARDS IDENTIFICATION OF THE PREPARATION This product does not present a health within the meaning of Directive 88/379/EEC Avoid inhalation of dust during mixing FIRST AID MEASURES General : In all cases of doubt, or when symptoms persist, seek medical attention Never give anything by mouth to an unconscious person Inhalation : Remove to fresh air, keep patient warm and at rest, if breathing is irregular or stopped, administer artificial respiration Give nothing by mouth If unconscious place in recovery position and seek medical advice Eye contact : Irrigate copiously with clean, fresh water for at least 10 minutes, holding the eyelids apart and seek medical advice Skin contact : Remove contaminated clothing Wash skin thoroughly with soap and water or use recognized skin cleanser Do NOT use solvents or thinners Ingestion : If accidentally swallowed obtain immediate medical attention Keep at rest Do NOT induce vomiting FIRE-FIGHTING MEASURES The product is not combustible ACCIDENTAL RELEASE MEASURES Excludes sources of ignition and ventilate the area Avoid breathing vapours Refer to protective measures listed in sections and Contain and collect spillage with non-combustible absorbent materials, e.g sand, earth, vermiculite, diatomaceous earth and place in container for disposal according to local regulations (see section 13) Do not allow to enter drains or watercourses If the product contaminates lakes, rivers or sewarages, inform appropriate authorities in accordance with local regulations SsangYong E&C 144/152 19.08.2013 MATERIAL SAFETY DATA SHEET PUTTY Date: 01/12/2005 Page of HANDLING AND STORAGE Handling Avoid skin and eye contact Avoid inhalation of dust Smoking, eating and drinking should be prohibited in application area For personal protection see Section Never use pressure to empty: container is not a pressure vessel Always keep in containers of same material as the original one Comply with the health and safety at work laws Storage Store in accordance with local regulations Observe label precautions Store in normal room temperature (20 to 40°C) in a dry, well-ventilated place away from sources of heat and direct sunlight Prevent unauthorized access Containers that are opened must be carefully resealed and kept upright to prevent leakage Keep out of reach of children Shelf life is 12 months in original sealed container EXPOSURE CONTROLS/PERSONAL PROTECTION Engineering Measures Provide adequate ventilation Personal Protection Hand protection: When skin exposure may occur, advice should be sought from glove suppliers on appropriate types Barrier creams may help to protect the exposed areas of the skin; they should however not be applied once exposure has occurred Eye protection: Use safety eyewear designed to protect against splash of liquids Skin protection: Cotton or cotton/synthetic overalls are normally suitable Grossly contaminated clothing should be removed and the skin washed with soap and water or an appropriate cleaner PHYSICAL AND CHEMICAL PROPERTIES Physical state : Powder Flash point : Not applicable Specific gravity : 0.90 – 1.10 g/cm³ Lower explosion limit : Solubility in water : Mixable 10 Method : ISO 3680 (Setaflash) Method : ISO 2811 (Pycnometer) STABILITY AND REACTIVITY Stable under recommended storage and handling conditions (See section7) Incompatible with oxidising agents, strongly acid and alkaline material In a fire , hazardous decomposition products such as carbon monoxide and dioxide, smoke, oxides of nitrogen may be produced SsangYong E&C 145/152 19.08.2013 MATERIAL SAFETY DATA SHEET PUTTY Date: 01/12/2005 11 Page of TOXICOLOGICAL INFORMATION There are no data available on the preparation itself Repeated or prolonged contact with the preparation may cause skin burns, irritation and possible allergic reaction Splashes in the eyes may cause irritation and reversible damage Ingestion may results in sore throat or abdominal pain 12 ECOLOGICAL INFORMATION There are no data available on the preparation itself The product should not be allowed to enter drains or watercourses 13 DISPOSAL CONSIDERATIONS Do not allow into drains or watercourses Wastes and emptied containers should be handled according to local regulations 14 TRANSPORT INFORMATION Transport only in accordance with ADR for road, RID for rail, IMDG for sea and ICAO/IATA for air transport Not regulated according to ADR,RID or IMDG 15 REGULATORY INFORMATION In accordance with 88/379/EEC the product is labelled as follows : Contains : No specific substance need to be named on the label R phrases : S phrases : S-2 : S-23 : S-38 : S-51 : No risk phrases 16 KEEP OUT REACH OF CHILDREN Do not breathe dust In case of insufficient ventilation, wear suitable respiratory equipment Use only in well ventilated areas OTHER INFORMATION Full text of R-phrases with no referred to in section 2: The information in this MSDS is based on the present state of our knowledge and on current EC and national laws, as the users’ working conditions are beyond our knowledge and control The product is not to be used for other purposes than those specified under section without first obtaining written handling instruction It is always the responsibility of the user to take all necessary steps in order to fulfil the demand laid down in the local rules and legislation The information in this MSDS is meant as a description of the safety requirements of our product It is not to be considered as a guarantee of the products’ properties The information in this Safety Data Sheet is required pursuant to EC directive 91/155/EEC SsangYong E&C 146/152 19.08.2013 Rivera Point Condominium Development -DESIGN AND BUILD OF MAIN TENDER (PHASE 1A) FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY ANNEX 6SHFLDO7RROV Project : Rivera Point Condominium Development Produced by : Ssangyong E&C Preparing Duration : 7days Revision : S SsangYong E&C 147/152 19.08.2013 GE Protimeter Mini® User Instructions GE Sensing Introduction The GE Protimeter Mini BLD2000 is used to measure the moisture content of wood and the wood moisture equivalent (WME) value of other non-conductive materials Procedure for Using the Protimeter Mini BLD2000 To use the Protimeter Mini BLD2000, the following: Remove the cap to expose the needle electrodes Switch the instrument ON by pressing and releasing the button Ensure that the battery symbol is illuminated (if it is flashing, the battery should be replaced) Push the pins into the surface of the material to be tested and observe the reading Alternatively, take moisture readings by using optional electrodes connected via the socket on the right-hand side of the instrument After use, replace the cap and switch the meter OFF by pressing and holding the button, or allow the instrument to switch OFF automatically Note: While the button is pressed, the current reading is held on the display; after seconds it will flash to signify that the instrument will switch OFF when released Automatic Switch-Off Adjustment Note: To maximize battery life, the instrument is programmed to switch off automatically after one minute If desired, the auto switch-off can be set at longer time periods, but this reduces the working life of the battery To change the auto switch-off, the following: Press and hold the flashing button for three seconds until the LED adjacent to %WME starts As soon as the LED starts to flash, release the button and then press repeatedly to select the desired auto switch-off time, as listed in Table below WME Scale Value 12 15 Table 1: Auto Switch Off Time Auto Switch Off Time WME Scale Value 60 seconds 90 seconds 120 seconds 150 seconds 18 21 24 Auto Switch Off Time 180 seconds 210 seconds 240 seconds INS2000, Rev A January 2006 SsangYong E&C 148/152 19.08.2013 Measurement Range and Interpretation In wood, the Protimeter Mini BLD2000 measures the moisture content from – 28%, the level at which the fibers are saturated In other non-conductive materials, the instrument measures the WME value up to 28% The WME value is the theoretical moisture level that would be attained by wood that is in moisture equilibrium with the material being tested The full measurement range is from – 90, but values over 28 are relative; they indicate increasingly high levels of moisture rather than actual moisture content The color-coded zones signify the moisture condition of the material under investigation The green, yellow, and red color-coded zones indicate the following: • Material in the green zone is in a safe air-dry condition • In the yellow zone, moisture levels are higher than normal but not critical; further investigation is recommended • The red zone represents excessive moisture levels If sustained, red zone moisture levels will lead to decay in organic materials Battery The Protimeter Mini BLD2000 is powered by one 6F22 9V battery Replace it when the low battery symbol flashes by removing the cover on the back of the instrument Ensure correct polarity when inserting the new battery Calibration Check Check the calibration of the Protimeter Mini BLD2000 in accordance with your quality control procedures by holding the electrode needles across the exposed wires of the Protimeter “Calcheck” device Correctly calibrated instruments will register a value of 17 – 19 Instruments that register a value outside this range should be returned to GE Sensing or to an authorized GE Protimeter distributor for servicing Care and Maintenance Store the instrument in a dry and stable environment Remove the battery if the instrument is not in regular use The information contained in this leaflet is given in good faith As the method of use of the instrument (and its accessories) and the interpretation of the readings are beyond the control of the manufacturers, they cannot accept responsibility for any loss, consequential or otherwise, resulting from its use USA 1100 Technology Park Drive Billerica, MA 01821-4111 Web: www.gesensing.com/protimeterproducts Ireland Shannon Industrial Estate Shannon, County Clare Web: www.gesensing.com/protimeterproducts Protimeter Mini® is a registered trademark of GE Page GE Protimeter Mini SsangYong E&C 149/152 19.08.2013 GE Sensing The Mini moisture meters are for general purpose measurement applications in construction materials years The enduring popularity and success of these instruments is attributable to their versatility, simple design, robust construction and ease of use • Pin type Typical users include: • Moisture scale for simple classification of dry, borderline or damp conditions in materials • Home inspectors • Comfortable to hold and easy to use • Flooring contractors • Termite pest control officers General Moisture Measurement Applications • Wood product manufacturers and traders • Cleaning and floor restoration professionals The Mini moisture meter series has been the choice for thousands of users across the world for more than 30 • Woodworkers Mini Protimeter Moisture Meters Mini is a Protimeter product Protimeter has joined other GE high-technology sensing businesses under a new name_ GE Industrial, Sensing g SsangYong E&C 150/152 19.08.2013 GE Sensing Building Surveying The Mini is ideal for assessing the moisture condition in buildings A color-coded scale enables the user to assess the moisture level of wood and dry wall at a glance The numerical values represent the actual percent moisture content of wood (% MC) and the wood moisture equivalent (WME) of concrete, dry wall and other materials The Mini can be used to determine if the fabrics of a building are in a dry, borderline or damp condition environments Contractors use the meter to assess if plasterwork is sufficiently dry for painting Manufacturers of wooden products such as furniture, roof trusses and pallets use the Mini for checking the moisture content of timber as delivered, and through the manufacturing process Home inspectors check moisture levels to assess the risk of mold grade When taking readings in awkward positions, the Mini can be used with the moisture probe and lead, supplied as standard with the instrument Optional hammer electrode and deep wall probes can be used with the Mini to measure the moisture level at depths in walls and floors, regardless of the surface condition These options are useful accessories when investigating the cause of moisture problems within buildings Quality Control Applications The Mini is a precision instrument suitable for a wide range of quality control applications on construction sites, for manufacturers and storage SsangYong E&C 151/152 19.08.2013 GE Sensing Mini Specifications Calibration Chart 150 commonly used species Plug in Extension pin probe (Included) Mini kit Calibration Check device (Included) Timbermaster Mini kit Timbermaster™ Mini Case Pouch with belt loop (Included) Low cost, digital pin-type moisture meter Warranty One year parts and labor Range 7% to 99.9% Options Hammer electrode Deep wall probes Display Digital, resolution 1/10 of 1% Mini Low cost, analog pin-type moisture meter Species Correction Nine species groups built in Part Number BLD5604 Range 6% to 90% numerical label Technical Specifications Display 60 LEDs_green (dry), yellow (at risk) and red (wet) Weight, Including Batteries 330 lbs (150g) Part Number BLD2000 Dimensions 7.02 in x 1.09 in x 1.91 in (180 mm x 28 mm x 49 mm) Power V (Included) Batteries AA (Included) Measurement Range % WME 6% to 90% SsangYong E&C 152/152 19.08.2013 ... location where you can not use Architecture working cage and Gondola for painting work So could you tell us you intend to use Spider man for painting work if any you have to get approval from RP... FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY SCOPE This method statement is for the Painting work The working Platform...Document Reference and Revision: Comment of MOS for painting work_ RevB Submission Description: Comment of MOS for painting work_ RevC Doc Rev Comment No Reviewer’s Name and Company Comments