Đang tải... (xem toàn văn)
Ngày đăng: 02/07/2018, 23:58
Xem thêm: Electrical-design-of-long-distance-HV-transmission-systems, 7 CONSTRUCTION, OPERATION, AND MAINTENANCE, 5 DESIGN, CONSTRUCTION, OPERATION, AND MAINTENANCE CONSIDERATIONS, FIGURE 1.6-1 Lattice (left) and Monopole (right) Towers, FIGURE 1.7-6 Hole Being Drilled for Footing Leaves a Mound of Dirt, Rocks, and Clay