Công nghệ xây dựng cầu nhanh

42 775 1
Công nghệ xây dựng cầu nhanh

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

Công nghệ xây dựng cầu nhanh

ADVANCINGACCELERATED BRIDGECONSTRUCTIONPresented atGeneral SessionAASHTO HSCOBS MeetingbyBenjamin Tang, FHWA Co-ChairMary Lou Ralls, AASHTO Co-ChairPrefabricated Bridge Elements and Systems Scan TeamJune 29, 2005 FOCUS AREAS - REVISITMinimized traffic disruption(Congestion)Improved work zone safetyMinimized environmental impactsImproved constructibilityImproved product qualityLower life-cycle costs FHWA VITAL FEWCongestionSafetyEnvironmental impact CATEGORIES OF TEAM’S10 RECOMMENDATIONSMovement SystemsSuperstructure SystemsDeck SystemsSubstructure Systems OPPORTUNITIES AHEADProposed Programs in Reauthorization• Innovative Bridge Research andDeployment (IBRD)• Highways for Life• Federal Bridge Program ($4 B/Yr.) Life After Scan - Next StepsDisseminate Report (Hot off the press!)Implementation Plan (STIP) – AdvancingTeam’s RecommendationsOngoing Technology Transfer ActivitiesCompiling Connection DetailsDeveloping Decision-Making Framework State Bridge Engineers’Survey Prefabricated Bridges to Accelerate ConstructionSurvey to Sample State Bridge EngineersQuestions: Barriers to routinely install PBES in hours ordays? What would help most to use PBES? Prefabricated Bridges to Accelerate ConstructionSurvey to Sample State Bridge EngineersQuestion: Barriers to routinely install PBES in hours ordays?Example Responses (lack of education / training /experience): Education of DOT and contractors. Training. Contractors are reluctant to bid on technologies,methods, or equipment with which they areunfamiliar. Engineers do not feel they are knowledgeable ondesigning projects for rapid construction.Exposure to / experience with large prefabsystems. Prefabricated Bridges to Accelerate ConstructionSurvey to Sample State Bridge EngineersQuestion: What would help most to use PBES?Example Responses (education / training / moreprojects): Training for contractors and owner inspectors(shop and field site). Projects in the U.S. that demonstrate rapid bridgeinstallation would provide examples and increaseinterest by State DOTs. More knowledge gained through experience. Education for design engineers and contractors. Information on how and why. 123doc.vn

Ngày đăng: 06/09/2012, 15:57

Từ khóa liên quan

Tài liệu cùng người dùng

Tài liệu liên quan